2025-05-02_CraneandHoist_V2

Operations training

Crane and Hoist / V2 02052025

ANNEX 1 - EQUIPMENT LIST

The following pages contain the lists of equipment required for delivering the Crane and Hoist Standard. The equipment required for training must be available and must fulfil national legal requirements where applicable. The tools, materials and equipment needed for the execution of the modules are listed in the following pages.

1.

Documentation:

a. Manuals for different crane and hoist types that will be covered in the training

b. Lift plan for loads being lifted during practical training (this should be based on the lift plan in Annex 7)

2.

Communication tools:

a.

Two-way radios

3.

Slings:

a.

Endless synthetic

b.

Web sling

c.

Chain

d.

Wire rope

4.

Spreader beam

5.

Hooks

6.

Shackles:

a. Bow type: both screw pin and bolt/nut type with appropriate securing pins and rings.

b. Dee type: both screw pin and bolt/nut type with appropriate securing pins and rings.

7.

Lifting accessories:

a.

Lifting bags

b.

Taglines

8.

Load attachments:

a.

Eye bolts and nuts

Global Wind Organisation ©2025 / www.globalwindsafety.org

73 / 111

Made with FlippingBook interactive PDF creator