CraneHoist 20230703v1

Operations training

Crane and Hoist / V1 2023-07-03

• Check the oil level in the slewing housing (min & max oil level, by eye)

• Check the bolts securing slewing house to the foundation for loose connections and/or that none are missing

8

Electronic components:

• Check for visual damage to the boxes which could indicate possible failure (loose & partly pulled wires)

9

Crane Controller:

• Check that the controls (electrical/manual ) function correctly, and return to a neutral position when released.

LED test: HIAB SWP 2 Only To do the test:

10

Press the ON/OFF button for at least 2 sec

• The test is activated and all the red LEDs are illuminated

• Release the button. After 3 sec, all the green LEDs are illuminated

• The test is finished when all LEDs are extinguished

Check all lifting equipment and lifting accessories to ensure in date Inspection certification

11

12

Visually check that all lift equipment and accessories are free from defects. Damage may include:

Cracks

Marks

• Bolted connections and/or abnormal wear; indicating that the equipment/accessories have been subject to excessive force

Check the crane top roller assembly. Check the condition, alignment security and excess play of pulley system and top roller assembly including all locking devices, pins and bushes

13

Locking wire

Circlips / locknut

Push-pin and retainer wire (HIAB SWP 2 Only)

Lynch-pin and retainer wire (HIAB SWP2 Only)

Global Wind Organisation ©2023 / www.globalwindsafety.org

81 / 107

Made with FlippingBook interactive PDF creator