Perfect Spaces Closets Installation Manual

Wall Hung Installation Step 1: Draw a line 1 5/8” below your top shelf height using the longest level you have. Standard (87”) location is 85 3/8".

Step 2: Mark the studs approximately 2” above the line. You’ll use these marks later for attaching L-Brackets to secure the unit and marking them at this height will keep you from having to go for your stud finder a second time.

10

Made with FlippingBook. PDF to flipbook with ease