Perfect Spaces Closets Installation Manual

Hybrid Wall/Floor Installations ● Many installations will consist of floor mounted units which abut wall hung units. In this case, the floor mounted units should always be set first in the room, as they set the height at which the wall hung units should be installed so that they match perfectly. Consider the following illustration:

● In this situation, you are preparing to mount one or more wall hung units to the right of an existing floor mounted unit. ● The center line for mounting the steel rail is 1 5/8" (1.625") below the top shelf of the floor mounted unit ● Once this point is found, then the rail can be installed and wall hung units can be hung ● If there are more than one floor mounted units in a room which will be connected by wall hung units between (even if the floor mounted units are on separate walls), then the floor mounted units should be set in place first. Then, any difference in heights between the units should be evened out with the rail that installed between the two. This will sometimes result in wall hung units that are slightly out of level. This is expected and will result in an installation that, to the naked eye, looks correct.

17

Made with FlippingBook. PDF to flipbook with ease