2018 UK | Hornsea Projects One & Two

2019 DENMARK | Nissum Bredning Wind Farm

Load-out of over 100 transition pieces at fabricator; monopile and transition piece marshaling.

Installation of wind turbines over shallow water via crawler crane on a conventional barge.

2013 SCOTLAND | Energy Park Fife Transport and load-out of

components, crane lifting and assembly of turbines near shore.

2022 UK | Seagreen Wind Farm Load-out of jackets from fabricator quay to vessel using PTC 210-DS super heavy lift crane.

2022 JAPAN | Akita Noshiro Offshore Wind Farm Monopile upending operation on deck via SPMT and vessel crane.

2018 UK | East Anglia ONE Weighing, upending, transport and load-out of 60 jacket foundations at port.

2016 UK | Dudgeon, Race Bank and Galloper Off- shore Wind Farms Over 4,000 separate operations to transport, load-in/out, marshal and assemble turbines and jackets.

2021 TAIWAN | Greater Changhua 1 and 2a Wind Farms Marshaling of monopiles and tran- sition pieces, port development, crane lifting for jacket assembly.

2019 FRANCE | Nacelle Unveiling Fabrication site transportation of Haliade-X 12MW nacelle during its world premiere.

2019 UK | Moray East Offshore Windfarm Load-out, transportation and installation of pre-piling template.

2020 UAE | Hollandse Kust Zuid Transport and load-out of substation, monopiles and jacket from fabrication yards.

2014 GERMANY | SylWin Alpha Floatover installation of 14,000t substation at sea, over ten days.