ATS Articulated Torque Arm Manual

Torque Arm Set-Up for ATS-15, ATS 1. Place the arm column base (C) on a perfectlyhorizontal working surface and bolt and washers. 2. Slide the articulated arm kit (A) onto the arm column and attach with hardware provided in box. 3. Attach the tool balancers (B) at the top of the arm column. Then, connect the tool balancer to the eye hook on the articulated arm kit (A). 15, ATS-25 and ATS-40 ) on a perfectly horizontal working surface and bolt it down with four M6 screws ) onto the arm column and attach with hardware provided in box. ) at the top of the arm column. Then, connect the tool balancer to the eye hook it down with four M6 screws ) at the top of the arm column. Then, connect the tool balancer to the eye hook(s)

vie

torque set

-up video guide

3

1

2

ATS-15, ATS-25 & ATS-40 4 x M6 + washers

Torque Arm Installation for ATS-80 80

1. Unfold articulated

Unfold articulated arm kit

SILICON VALLEY HEADQUARTERS 1080 North 11th Street, San Jose, CA 95112 | Phone: (408) 292 1080 North 11th Street, San Jose, CA 95112 | Phone: (408) 292-2214 | Fax: (408) 292-2733 | mountztorque.com

3

Made with FlippingBook flipbook maker