Greensleeves Homes Trust

Environmental ambitions and progress

Target

Date Set Achieved so far

Building Standards

100% of new build capital projects achieving BREEAM Excellent from January 2024

2022

Completed

100% of refurbishment capital projects achieving BREEAM Very Good or mitigation actions implemented where BREEAM not applicable

2022

Completed

Energy Efficiency

Install energy and meters in homes linked to BMS system by end 2026

2022

Ongoing

Install 100% LED lighting in homes by end 2026

2022

Ongoing

Install timeclock/sensors technology for external lighting in homes by end 2026

2022

Ongoing

All new build and refurbishment projects designed to accommodate low carbon heating systems wherever technically feasible by end 2022 2022

Completed

Care homes to be fossil fuel free by 2030 • Renewable power • Solar (PV) units to be installed wherever possible in homes. • Homes surveys to assess energy assessment and produce a strategy for improvement. • Electric systems for heating and hot water.

2022

All power contracts 100% renewable. No new gas boilers or gas dryers

Waste

Moved to a centralized waste management contract to increase recycling percentages. Food waste action plans to reduce food waste in homes. Replacement of single use products with reusable alternatives Zero waste to landfill for all capital projects by 2030

2022

Complete

Ongoing

Transportation

100% of all new build projects to install min. 2 EV charge points

Complying

Operating a cycle to work scheme to reduce staff reliance on cars.

Completed

Made with FlippingBook flipbook maker