Environmental ambitions and progress
Target
Date Set Achieved so far
Building Standards
100% of new build capital projects achieving BREEAM Excellent from January 2024
2022
Completed
100% of refurbishment capital projects achieving BREEAM Very Good or mitigation actions implemented where BREEAM not applicable
2022
Completed
Energy Efficiency
Install energy and meters in homes linked to BMS system by end 2026
2022
Ongoing
Install 100% LED lighting in homes by end 2026
2022
Ongoing
Install timeclock/sensors technology for external lighting in homes by end 2026
2022
Ongoing
All new build and refurbishment projects designed to accommodate low carbon heating systems wherever technically feasible by end 2022 2022
Completed
Care homes to be fossil fuel free by 2030 • Renewable power • Solar (PV) units to be installed wherever possible in homes. • Homes surveys to assess energy assessment and produce a strategy for improvement. • Electric systems for heating and hot water.
2022
All power contracts 100% renewable. No new gas boilers or gas dryers
Waste
Moved to a centralized waste management contract to increase recycling percentages. Food waste action plans to reduce food waste in homes. Replacement of single use products with reusable alternatives Zero waste to landfill for all capital projects by 2030
2022
Complete
Ongoing
Transportation
100% of all new build projects to install min. 2 EV charge points
Complying
Operating a cycle to work scheme to reduce staff reliance on cars.
Completed
Made with FlippingBook flipbook maker