Context Segment
Locally Preferred Cross-Section Alternative
Handley Dr to Dottie Lynn Pkwy • 4 Lanes • S hared-Use Path (North Side) • M anaged Technology Corridor
Segments east of IH 820 are unfunded and require additional study and design by NCTCOG and TxDOT. The cross-sections are illustrative and meant to demonstrate ideas heard from the public.
P lease note that the final roadway configuration is subject to TxDOT design and environmental review.
Alternatives Analysis
Page 11
Made with FlippingBook - Online catalogs