Revised Eastside LPA

Context Segment

Locally Preferred Cross-Section Alternative

Handley Dr to Dottie Lynn Pkwy • 4 Lanes • S hared-Use Path (North Side) • M anaged Technology Corridor

Segments east of IH 820 are unfunded and require additional study and design by NCTCOG and TxDOT. The cross-sections are illustrative and meant to demonstrate ideas heard from the public.

P lease note that the final roadway configuration is subject to TxDOT design and environmental review.

Alternatives Analysis

Page 11

Made with FlippingBook - Online catalogs