Revised Eastside LPA

Alternatives Analysis Process The alternatives analysis in this plan was driven by the objective to select a Locally Preferred Alternative (LPA) for the following three components:

1. Route 89 2. East Lancaster Avenue 3. Bridge Street and Brentwood Stair Road

For each component, the alternatives analysis followed a five-step process to identify an LPA.

1

2

3

4

5

Figure 1: Alternatives Analysis Process

Alternatives Analysis

Page 3

Made with FlippingBook - Online catalogs