Our Vancouver Generic Template

Figure 43: Cross Section Alternatives Grouping

Alternative Grouping

Safety

Traffic Operations

Transit Service

6 Vehicle Lanes with Shared Transit

6 Lane Managed Technology Corridor (Right-Running Transit)

4 Vehicle Lanes + 2 Transit Lanes (Center-Running Dedicated)

Performance Against Criteria

High

Medium

Low

Locally Preferred Alternative: Four to Six-Lane Managed Technology Corridor (Right-Running Transit)

Based on the results of the screening process and input from project partners and stakeholders, the locally preferred alternative for East Lancaster Avenue from Riverside Drive to IH-820 is a six-lane managed technology corridor. Due to ROW constraints, the locally preferred alternative for the segments between Main Street and Riverside Drive and from IH-820 to Dottie Lynn Parkway is four-lanes with shared transit that incorporates all the other elements of Tech-Based Rapid Transit. The locally preferred alternatives were selected due to their ability to reduce crashes, maintain acceptable traffic operations, and accommodate a flexible tech-based rapid transit service.

T he final roadway configuration is subject to NCTCOG and TxDOT design and environmental review. Long- term capacity improvements and needs will be determined by TxDOT.

110 Table of Contents

FORT WORTH EASTSIDE TRANSPORTATION PLAN

Made with FlippingBook. PDF to flipbook with ease