Potential Transit Projects
The transit projects summarized in Table 11 and illustrated in Figure 50 include potential route extensions and realignments, new connections, station locations, and traffic signal improvements. The projects, geared towards improving transit safety, access and connectivity, enhance connectivity to existing and planned development areas and provide service in areas that are currently underserved. Please note that the projects below primarily focus on access and connectivity. Additional study will be needed to explore operations and maintenance considerations. Other transit elements that improve and enhance the overall transit system were identified (mid-block crossings, queue jumps, etc.) and maps depicting them are in the Appendix.
Table 11: Potential Transit Projects
PROJECT TYPE
LOCATION
DESCRIPTION
Enhance traffic signals along E. Lancaster Ave and E. Rosedale St. to prioritize transit vehicles to improve reliability and decrease transit travel time along the corridor. Potential transit station/ hub for IH-30 express bus service, Red Route, and Green Route. Realign Ederville Rd segment of Route 22 to Brentwood Stair Rd.
Ea st Lancaster Ave at Various Intersection
Transit Signal Priority
IH-30 and Eastchase Pkwy
Eastchase and IH-30 Station
Brentwood Stair Rd
Route 22 Realignment
Beach St, IH-30 Frontage Lanes, and Bridge St
Bridge Street Express Route On-Demand Transit Expansion
Provides high-frequency bus service.
Expand On-Demand service to the area between Oakland Blvd and Eastchase Pkwy. Add queue jumps at intersections of East Lancaster Ave and Beach, Collard, Oakland, Edgewood Ter, Canton Dr, and Handley Dr. Transit connection to connect to Trinity Lakes TRE Station as a destination. Transit connection to connect to Bell Helicopter TRE Station as a destination.
South of IH-30
Ea st Lancaster Ave at Various Intersection
Queue Jumps
Connection to Trinity Lakes TRE Station Connection to Bell Helicopter TRE Station Potential Transfer Station to Arlington VIA Potential IH-30 Express Service
Northward on IH-820
Eastchase Pkwy northward
East Lancaster Ave into Arlington IH—30 through study area
Connect transit system into Arlington.
Higher capacity transit connection along IH-30 to improve route schedules.