Our Vancouver Generic Template

Potential Transit Projects

The transit projects summarized in Table 11 and illustrated in Figure 50 include potential route extensions and realignments, new connections, station locations, and traffic signal improvements. The projects, geared towards improving transit safety, access and connectivity, enhance connectivity to existing and planned development areas and provide service in areas that are currently underserved. Please note that the projects below primarily focus on access and connectivity. Additional study will be needed to explore operations and maintenance considerations. Other transit elements that improve and enhance the overall transit system were identified (mid-block crossings, queue jumps, etc.) and maps depicting them are in the Appendix.

Table 11: Potential Transit Projects

PROJECT TYPE

LOCATION

DESCRIPTION

 Enhance traffic signals along E. Lancaster Ave and E. Rosedale St. to prioritize transit vehicles to improve reliability and decrease transit travel time along the corridor.  Potential transit station/ hub for IH-30 express bus service, Red Route, and Green Route.  Realign Ederville Rd segment of Route 22 to Brentwood Stair Rd.

Ea st Lancaster Ave at Various Intersection

Transit Signal Priority

IH-30 and Eastchase Pkwy

Eastchase and IH-30 Station

Brentwood Stair Rd

Route 22 Realignment

Beach St, IH-30 Frontage Lanes, and Bridge St

Bridge Street Express Route On-Demand Transit Expansion

 Provides high-frequency bus service.

 Expand On-Demand service to the area between Oakland Blvd and Eastchase Pkwy.  Add queue jumps at intersections of East Lancaster Ave and Beach, Collard, Oakland, Edgewood Ter, Canton Dr, and Handley Dr.  Transit connection to connect to Trinity Lakes TRE Station as a destination.  Transit connection to connect to Bell Helicopter TRE Station as a destination.

South of IH-30

Ea st Lancaster Ave at Various Intersection

Queue Jumps

Connection to Trinity Lakes TRE Station Connection to Bell Helicopter TRE Station Potential Transfer Station to Arlington VIA Potential IH-30 Express Service

Northward on IH-820

Eastchase Pkwy northward

East Lancaster Ave into Arlington IH—30 through study area

 Connect transit system into Arlington.

 Higher capacity transit connection along IH-30 to improve route schedules.

120 Table of Contents

FORT WORTH EASTSIDE TRANSPORTATION PLAN

Made with FlippingBook. PDF to flipbook with ease