Our Vancouver Generic Template

However, only elements associated with the LPA were ranked and prioritized in this section. Sources used for the data criteria can be found in the Appendix.

Figure 88: Project Prioritization Process

Metrics

Prioritization Criteria

The project prioritization tool, detailed in Table 17, scores projects based on their impact on overall mobility, safety, and quality of life. It also considers how difficult it may be to navigate the project through the development process. It considers both quantitative and qualitive performance indicators, and projects may receive a maximum of 10 points based on fully or partially satisfying each criterion.

Table 17: Project Prioritization Criteria

CRITERIA WEIGHT

PRIORITIZATION CRITERIA

GOAL(S)

Safety 1. Does the project improve a roadway on the City of Fort Worth's High Injury Network?

Safety, Connectivity Safety, Connectivity

10

2. Does the project improve a roadway or intersection with a high crash rate?

10

182 Table of Contents

FORT WORTH EASTSIDE TRANSPORTATION PLAN

Made with FlippingBook. PDF to flipbook with ease