Our Vancouver Generic Template

CRITERIA WEIGHT

PRIORITIZATION CRITERIA

GOAL(S)

Connectivity 3. Does the project improve or create a new connection to an existing or planned traffic generator? 4. Does the project improve the street grid by creating or improving a connection to or between existing major or minor arterial roads? Traffic Operations 5. Does the roadway enhance or add capacity to a roadway currently or forecasted to operate at LOS D or above?

Connectivity, Place

10

Connectivity

10

Connectivity

10

Multimodal

Connectivity, Place, Environment, Equity, Safety Connectivity, Place, Environment, Equity

6. Does the project enhance walkability or bikeability through the inclusion or improvement of sidewalks, bike connections, or block structure?

10

7. Does the project provide or enhance connectivity to existing or planned transit stops, stations, or routes?

10

Quality of Life

Environment, Place, Connectivity

8. Does the project provide or enhance connectivity to a planned or existing school, park, neighborhood, or entertainment venue?

10

183 Table of Contents

FORT WORTH EASTSIDE TRANSPORTATION PLAN

Made with FlippingBook. PDF to flipbook with ease