CWU-Board-Meeting-Agenda-10-22

+&06LJQDOL]HG,QWHUVHFWLRQ&DSDFLW\$QDO\VLV :LOGFDW:D\ 8QLYHUVLW\:D\

03/02/2018

Movement

EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Heavy Vehicles (%) Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) Frt Adj. Flow (vph) Turn Type Uniform Delay, d1 Progression Factor Incremental Delay, d2 Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM 2000 Control Delay Delay (s) v/s Ratio Prot v/s Ratio Perm v/c Ratio

111 473 111 473

13 13

19 458 19 458

85 85

30 30

87 87

33 103 103 125 33 103 103 125

1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

4.0

4.0

4.0 4.0 1.00 1.00 1.00 0.98 0.98 1.00 1.00 0.96 0.95 1.00 1761 1784 0.35 1.00 640 1784

4.0 4.0 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.92 0.95 1.00 1711 1693 0.64 1.00 1146 1693

0.95 1.00 0.99 1.00 0.99 3469 0.74 2579

0.95 0.98 1.00 0.98 1.00 3398 0.93 3152

0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87

128 544

15

22 526

98

34 100

38 118 118 144

0

2

0 0

0

14

0 0

0

24

0

0

79

0 0

0 685

0 632

34 114

0 118 183

48

22

22

48

38

59

59

38

1

2% 2% 2% 2% 2% 2% 0% 0% 0% 0% 0% 0%

Perm NA

Perm NA

Perm NA

Perm NA

2

2

1

1

2

2

1

1

47.9 47.9 0.69

47.9 47.9 0.69

13.1 13.1 13.1 13.1 0.19 0.19 4.0 4.0 3.0 3.0 121 338 0.28 0.34 23.9 24.2 1.00 1.00 1.3 0.6 25.2 24.8 C C 0.06 0.05

13.1 13.1 13.1 13.1 0.19 0.19 4.0 4.0 3.0 3.0 217 321 0.54 0.57 25.3 25.4 1.00 1.00 2.8 2.3 28.0 27.7 C C c0.11 0.10

4.0 0.2

4.0 0.2

1790

2188

c0.27 0.38

0.20 0.29

4.4

4.0

0.69

1.00

0.6 3.6

0.3 4.4

A

A

3.6

4.4

24.9

27.8

A

A

C

C

10.7 0.42 69.0

HCM 2000 Level of Service

B

HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization

Sum of lost time (s)

8.0

68.1% ICU Level of Service

C

Analysis Period (min) c Critical Lane Group

15

2017 Existing PM Peak Hour

Synchro 10 Report

Made with FlippingBook flipbook maker