Land at Sun Street, Frome PROFESSIONAL PLANNING APPRAISAL
▪ A Resource Efficiency Statement (this is essentially a statement setting out
sustainable design and construction measures);
▪ A Noise Impact Assessment incorporating a noise survey and setting out any
necessary noise attenuation to mitigate noise from the adjacent public
house (unless vacant);
▪ Drainage Strategy (details on the site plan should suffice with full details, if
necessary, being secured by condition);
▪ Existing and proposed site plans (showing neighbouring land and buildings,
refuse/recycling/cycle storage and proposed boundary treatments);
▪ Proposed floor plans, roof plan, sections (showing finished floor and site
levels) and elevations (incorporating an external materials schedule).
6. POTENTIAL LAYOUTS
6.1 A potential site layout proposing a single dwelling is provided.
6.2 This has been prepared based on a desk-top only review of the site’s constraints
and relationship to context, and in the absence of any survey information.
6.3 The layout is indicative only. Different variations may be possible, and it is
recommended that a pre-application enquiry is submitted to agree a scheme with
the Council prior to any formal application.
12 | P a g e
Made with FlippingBook Learn more on our blog