WAKE FOREST PUBLIC TRANSIT PLAN

Circulators The operating costs for the circulators are based on the cost to operate the WFL. Table 6 outlines the current operating characteristics for the WFL (A and B loops) and the annual operating cost assumed by the Town of Wake Forest and GoRaleigh for FY 2024. The total cost for the WFL’s Monday to Friday and Saturday service is approximately $1,002,000 ($854,000 for weekday service, and $148,000 for Saturdays). The cost is based on a unit operating cost set by GoRaleigh of $109.39 per vehicle hour. These factors are assumed as the basis to develop an opinion of planning-level operating cost for the East and West loops. Note, approximately 17% of the WFL operates in the City of Raleigh (based on the route’s length), therefore the cost to the Town of Wake Forest is 83% of the total cost – approximately $832,000.

Table 6: WFL Operating Cost (FY2024) for A and B Loops

Monday to Friday

Saturday

Route Length (miles) Frequency (minutes)

16 (one-way for each loop)

16 (one-way for each loop)

65 minutes

75 minutes

Revenue Hours per Day

14

12

Number of Vehicles

2 (one for each loop)

2 (one for each loop)

Vehicle Revenue Hours per Day Total Vehicle Hours per Day 1

28 30

24 30 52

Days per Year 2

260

Vehicle Revenue Hours per Year

7,800

1,352

Annual Operating Cost 3 Cost per Vehicle Hour

$854,000 $109.39

$148,000

$109.39 1 Includes one hour of deadhead per day for each vehicle to account for travel to and from bus garage. 2 Average weekdays and Saturdays per year. 3 Rounded up to the nearest 1,000ths.