Wake Forest Public Transit Plan - October 2023

WAKE FOREST PUBLIC TRANSIT PLAN

(assuming the current cost-splitting arrangement continues in a similar fashion).

Table 7 summarizes the assumptions and the planning-level annual operating costs for East and West loops. The routes have a similar travel time, therefore the costs are identical – $550,000 per year for each loop ($1,100,000 total). Like the WFL, approximately 17% of the West Loop route length operates in the City of Raleigh, therefore the project team assumes that under a similar agreement between Raleigh and Town of Wake Forest, the cost of the West Loop to the Town is 83% of the total cost – $457,000 for a total of $1,007,000 for both loops (assuming the current cost-splitting arrangement continues in a similar fashion).

Table 7: Estimated Annual Operating Cost for Circulator – 60-minute Frequency

West Loop (Counterclockwise)

East Loop (Clockwise)

Route Length (miles) Frequency (minutes)

12 (one-way)

13 (one-way)

60 15

60 15

Revenue Hours per Day 1

Number of Vehicles Total Hours per Day

1

1

15 16

15 16

Total Vehicle Hours per Day 2

Days per Year 3

312

312

Vehicle Revenue Hours per Year 4,992

4,992

Cost per Vehicle Hour 4

$109.39

$109.39

$550,000

$550,000

Annual Operating Cost

Annual Operating Cost (minus City of Raleigh Portion – 17%) Total Annual Operating Cost 5

$457,000

$550,000

$1,007,000

1 6:00 a.m. to 9:00 p.m. 2 Includes one hour of deadhead per day for each vehicle to account for travel to and from bus garage. 3 Average weekdays and Saturdays per year. 4 Based on FY2024 cost per revenue hour for GoRaleigh fixed route. 5 Assumes the cost-splitting arrangement between Raleigh and Wake Forest continues in a similar fashion.

| 35 |