C ONSTRUCTION OF THE S TAND
Unit stand only comes in 1 size: 36 ” stand. The stand will be shipped pre-assembled, separately from the unit. Bolt
packages are included with each stand. All bolts are Grade 8,
zinc-plated 3/8"-16 x 1" bolts with flat washers, and lock nuts.
Using (16) 3/8" Bolts, Nuts, and Flat Washers,
assemble the Horizontal Channels to the Leg
Weldments. Make sure to put washers on each side of
parts being fastened together.
Using (8) 3/8" Bolts, Nuts, and Flat Washers,
assemble the Cross Braces to the Leg Weldments /
Side Assemblies. Make sure to put washers on each
side of parts being fastened together. Make sure to
place one brace on the inside, and one on the outside.
Using (16) 3/8" Bolts, Nuts, and Flat Washers,
assemble the Horizontal Channels to the Side
Assemblies. Make sure to put washers on each side of
parts being fastened together.
Using (8) 3/8" Bolts, Nuts, and Flat Washers,
assemble the Cross Braces to the Leg Weldments /
Side Assemblies. Make sure to put washers on each
side of parts being fastened together. Make sure to
place one brace on the inside, and one on the outside.
Using (4) 1/2" Anchor Bolts, anchor the stand to the concrete pad / floor. Holes will need to be drilled
into the concrete prior to driving the concrete anchors (not supplied). (One at each leg.)
Page 19
sales@clean-air.com
clean-air.com
1-866-665-1829
Made with FlippingBook Annual report maker