Construction The most difficult part of camp construction is building the foundation. It involves either the construction of a floating platform or the construction of a raised platform. This phase of construction requires the heaviest logistics: pontoons, poles, heavy timbers, etc. After the foundation is built, the remaining construction is accomplished with modular transportable materials (small pieces that fit in a boat): – sheet materials like plywood, and metal building components – roll materials like sheet metal and roll roofing – lumber and boards. Camps were and still are built from leftover or salvaged materials.

New weather Recent hurricanes – Katrina, Rita and Gustav – devastated Camp populations, especially in the marsh along the coast. The coastal Camps have sprung right back up, larger and stronger and with them, so have land prices and the Building Codes. On the other hand, the Basin Camps managed the storm surges from the hurricanes and were somewhat protected from the winds. Unfortunately, accessibility to coastal Camps has become a financial hurdle, rather than a physical one. But the Basin and other swamp areas are the holdout for the middle-income Camp. Building codes aren’t enforced in the swamp, yet, and the sites are generally leased from the State for a reasonable fee. *

15

weather matters: On Site review 21

Made with FlippingBook interactive PDF creator