Whitestone Associates, Inc. Offers the Following Accredited Lunch & Learn Presentations for AIA Learning Units (LU) and P.E. Professional Development Hours (PDH). Page 1 of 2
HEALTH, SAFETY AND WELFARE CREDITS
Asbestos Containing Materials Identification, Evaluation & Management (1.0 LU/HSW/PDH) ▪ Introduction to asbestos and asbestos containing materials ▪ Exposure and health effects ▪ Applicable regulations ▪ Survey requirements and what suspect materials need to be sampled ▪ Types of laboratory analyses, abatement options and techniques, and limitations to survey and abatement
LEARNING UNIT CREDITS
Ground Improvement Overview (1.0 LU/PDH) ▪
Discussion of site conditions as they relate to ground improvement strategies ▪ Ground improvement methodologies ▪ Typical applications ▪ Advantages and disadvantages of different strategies ▪ Ground Improvement, Dynamic Compaction, Stone Columns, Lightweight Fill, Wick Drains, Surcharge
Special Inspections/Third Party Inspections (1.0 LU/PDH) ▪ Special Inspections ▪ Building Code Applicability ▪ Materials Testing
Geotechnical 101 (1.0 LU/PDH) ▪ Subsurface Exploration ▪ Scoping ▪ Field Exploration ▪
Regional Geologic Considerations Post Investigation Consultation
▪
Stormwater Management Area Design: Construction Considerations & Agency Requirements (1.0 LU/PDH) ▪ Site SWM Area Evaluation ▪ Seasonal High Groundwater & Infiltration Testing Methods ▪ Agency Requirements Overview ▪ Field Investigation Logistics
Retaining Walls 101 (1.0 LU/PDH) ▪ Types of Retaining Walls ▪ Failure Modes ▪ Site Considerations ▪ Wall Design ▪ Permanent Rock Slopes ▪ Permanent Soil Slopes
Office Locations:
N EW J ERSEY
P ENNSYLVANIA
M ASSACHUSETTS
C ONNECTICUT
F LORIDA
N EW H AMPSHIRE
N EW Y ORK
Whitestone Associates, Inc. Offers the Following Accredited Lunch & Learn Presentations for AIA Learning Units (LU) and P.E. Professional Development Hours (PDH). Page 2 of 2
Property Condition Assessments 101 (1.0 LU/PDH) ▪ Purpose of a PCA ▪ Documentation and review process ▪ Walk-Through Survey ▪ Physical deficiencies and potential costs to remedy ▪ Standard and non-standard scope items
Integrating Ecological Services into Development Projects: Methods of Sustainable Site Planning & Regulatory Compliance (1.0 LU/PDH) ▪ Understand the importance of ecological services in sustainable and compliant development ▪ Learn how ecological resources are assessed ▪ Understand regulatory requirements at local, state, and federal levels ▪ Understanding how to apply sustainable site planning to enhance ecological resources and comply with regulations
Environmental & Geotechnical Due Diligence Investigations Procedure, Timing & Suggestions (1.0 LU/PDH)
Environmental ▪
Phase I Environmental Site Assessment
▪
Phase II Site Investigations
▪
Asbestos & Lead Based Paint Surveys
▪
Remedial Actions
▪
Administrative & Procedural Hurdles
▪
Potential Cost Saving Measures
Geotechnical ▪
Geotechnical Investigation
▪
Regional Geologic & Special Considerations
▪ Design Consultation & Pre-Construction Involvement ▪ Construction Phase Testing & Inspection ▪ Potential Cost Saving Measures
Office Locations:
N EW J ERSEY
P ENNSYLVANIA
M ASSACHUSETTS
C ONNECTICUT
F LORIDA
N EW H AMPSHIRE
N EW Y ORK
Page 1 Page 2Made with FlippingBook Online newsletter maker