Consolidated Transportation Program CTP FY 2025-2030

MARYLAND TRANSPORTATION AUTHORITY -- Line 10

Primary Construction Program

PROJECT: I-95 Fort McHenry Tunnel - Convert to Cashless Tolling

DESCRIPTION: Remove the existing toll booths and plaza elements, construct gantry structures, and reconstruct the plaza roadway to convert to all-electronic (cashless) tolling; construct underground infrastructure, utilities, stormwater management, signing and marking, and commercial inspection area.

PURPOSE & NEED SUMMARY STATEMENT: All-electronic (cashless) tolling provides toll collection at highway speeds through the electronic methods of E-ZPass and video tolling. The advantages of converting to cashless tolling include reduced travel time; increased safety/reduced crashes; improved customer convenience; reduced emissions; and reduction in toll collection and maintenance costs. Cashless tolling has been used successfully at the MDTA's MD 200 Intercounty Connector (ICC) and the I-95 Express Toll Lanes (ETL).

STATE GOALS : Maryland Transportation Plan (MTP) Goals/Selection Criteria: X Enhance Safety and Security X

Serve Communities and Support the Economy

X

SMART GROWTH STATUS:

Project Not Location Specific

Not Subject to PFA Law

X

Promote Environmental Stewardship

Deliver System Quality

Project Inside PFA Project Outside PFA

Grandfathered

Exception Will Be Required

EXPLANATION: Changing to cashless tolling at the Fort McHenry Tunnel provides toll collection at highway speeds through the electronic methods of E-ZPass, Pay-By-Plate, and Video Tolling.

PFA Status Yet to Be Determined

Exception Granted

STATUS: Engineering is complete. Construction is underway.

SPECIAL

FEDERAL

OTHER

X

GENERAL

POTENTIAL FUNDING SOURCE:

TOTAL

PHASE

ESTIMATED EXPENDED PREVIOUS

CURRENT

BUDGET

PLANNING

SIX

BALANCE SIGNIFICANT CHANGE FROM FY 2024 - 29 CTP: None.

COST

THRU YEAR

YEAR

YEAR

FOR PLANNING PURPOSES ONLY

YEAR

TO

($000) CLOSE YEAR 2024

2025

2026

...2027... ...2028...

...2029...

...2030...

TOTAL

COMPLETE

Planning

0

0

0

0

0

0

0

0

0

0

0

Engineering

2,542

2,542

0

0

0

0

0

0

0

0

0

Right-of-way

0

0

0

0

0

0

0

0

0

0

0

Utility

0

0

0

0

0

0

0

0

0

0

0

Construction

19,910

19,093

7,520

817

0

0

0

0

0

817

0

Total

22,452

21,635

7,520

817

0

0

0

0

0

817

0

Federal-Aid

0

0

0

0

0

0

0

0

0

0

0

TOLL

22,452

21,635

7,520

817

0

0

0

0

0

817

0

Other

0

0

0

0

0

0

0

0

0

0

0

2517