Operations training
High Voltage Standard / V0 - DRAFT 2025-03-21
e. fault detection - arc flash detection, protective relays, and others
Illustrate different types of typical testing activity such as:
a.
testing LV components within the HV system
b.
relays injection testing, CT, VT, SF6
c.
transformer insulation testing
d.
partial discharge (PD) testing
The participants shall:
Observe, discuss and ask questions about testing activities and related tools and devices
Ask questions about installed instrumentation and portable equipment, testing tools, and fault detection features.
ELEMENT 14.3 - SAFE CONTROL OF HV EQUIPMENT DURING TESTING ACTIVITY
To achieve the lesson learning objectives, the participants can:
126) Perform steps as designated for safe control of HV equipment during testing activity (Skills, intermediate level)
127) Act independently to maintain situational awareness during testing activity, recognising and responding to signs and indicators of abnormal HV system conditions (Ability, intermediate level)
128) Perform appropriate actions to maintain safety upon indications that operations did not proceed as normally expected (Skills, intermediate level)
129) Apply manufacturer guidelines for safe control during testing (Skills, intermediate level)
The instructor shall:
Demonstrate how to establish and maintain safe control of HV equipment during testing activity:
a.
Recognising proper operations
b.
Situational Awareness
c.
Typical Signs and Indicators