20250324 HV V0 DRAFT

Operations training

High Voltage Standard / V0 - DRAFT 2025-03-21

TOTAL

70 min.

Inspecting the cable for damage during pulling operations How to evaluate damage or puncture holes in outer core TOTAL

4. Cable Inspection

4.1

4.2

20 min.

5. Safe working during HV cable pulling operations

5.1

Safe work practices and effective team coordination

5.2

Hazard awareness and mitigation TOTAL

40 min.

6. Preparation of HV cable and tools

6.1

Preparation and protection of HV cable

6.2

Preparation of equipment and tools TOTAL

30 min.

7. Handling the HV Cable

7.1

Installation of cable socks

7.2

HV cable handling and stress control TOTAL

75 min.

8. Conducting the Cable Pulling Operation

8.1

How to pull a HV cable - methods and techniques

8.2

Attention during cable pulling - do's and don'ts TOTAL

90 min.

9. Completing the Cable Pull

9.1

Cable fastening

Installation of the cable loop in tower and walk down and inspection TOTAL

9.2

30 min.

10. Training review

10.1 Training review 10.2 Feedback session TOTAL

10 min.

GRAND TOTAL

465 min.

8.6 Detailed Description of the High Voltage Cable Pulling Module MODULE INTRODUCTION

25 min.

The aim of this lesson is for the participants to be motivated to engage in the GWO High Voltage Cable Pulling Module safely at a training facility, while recognising what is expected of them during the training.

After having successfully completed this lesson, the participants can:

Global Wind Organisation / www.globalwindsafety.org

71 / 114

Made with FlippingBook flipbook maker