Operations training
High Voltage Standard / V0 - DRAFT 2025-03-21
TOTAL
70 min.
Inspecting the cable for damage during pulling operations How to evaluate damage or puncture holes in outer core TOTAL
4. Cable Inspection
4.1
4.2
20 min.
5. Safe working during HV cable pulling operations
5.1
Safe work practices and effective team coordination
5.2
Hazard awareness and mitigation TOTAL
40 min.
6. Preparation of HV cable and tools
6.1
Preparation and protection of HV cable
6.2
Preparation of equipment and tools TOTAL
30 min.
7. Handling the HV Cable
7.1
Installation of cable socks
7.2
HV cable handling and stress control TOTAL
75 min.
8. Conducting the Cable Pulling Operation
8.1
How to pull a HV cable - methods and techniques
8.2
Attention during cable pulling - do's and don'ts TOTAL
90 min.
9. Completing the Cable Pull
9.1
Cable fastening
Installation of the cable loop in tower and walk down and inspection TOTAL
9.2
30 min.
10. Training review
10.1 Training review 10.2 Feedback session TOTAL
10 min.
GRAND TOTAL
465 min.
8.6 Detailed Description of the High Voltage Cable Pulling Module MODULE INTRODUCTION
25 min.
The aim of this lesson is for the participants to be motivated to engage in the GWO High Voltage Cable Pulling Module safely at a training facility, while recognising what is expected of them during the training.
After having successfully completed this lesson, the participants can:
Global Wind Organisation / www.globalwindsafety.org
71 / 114
Made with FlippingBook flipbook maker