Operations training
High Voltage Standard / V0 - DRAFT 2025-03-21
ELEMENT 7.1 - INSTALLATION OF CABLE SOCKS
To achieve the lesson learning objectives, the participants can:
43) Perform installation and securing of cable socks using various methods and for different cable sock types (Skills, intermediate level)
44) Perform correct sewing techniques for cable socks following the manufactures’ instructions (Skills, intermediate level)
The instructor shall:
Describe a range of typical HV cable pulling scenarios
Explain typical methods, types, techniques and good practices for installation of cable socks
Demonstrate the correct techniques for sewing cable sock
Show illustrative examples from cable operations to including installation of cable socks:
a.
identifying the position marking on cable
b.
different methods
c.
various types of cable socks
d. ensuring cable and sock are clean of debris or soiling before fitting sock
e.
sewing cable sock
Issue cable and cable socks to each individual to practice independently
The participants shall:
Practice methods, techniques and good practices for installation of different types of cable socks
Practice correct techniques for sewing cable sock independently and present your results to the rest of the group for comparison
a. Reflect on the different methods or techniques that could improve the secure application of the cable sock
Global Wind Organisation / www.globalwindsafety.org
92 / 114
Made with FlippingBook flipbook maker