20250324 HV V0 DRAFT

Operations training

High Voltage Standard / V0 - DRAFT 2025-03-21

a.

Cleanup and restoration

Explain how to determine if a cable is sufficiently secured, ensuring compliance with work instructions and safety standards.

Inspection Walkthrough:

a. Lead participants through a walk-down inspection post cable installation, highlighting cleanup and cable protection measures.

The participants shall:

Worksite cleanup and final inspection:

a. complete a simulated post-installation site walk-down, identifying any hazards, securing loose materials, and ensuring the cable is protected.

TRAINING REVIEW

15 min.

The aim of this lesson is to enable the participants to reflect on and process their learning outcomes and key takeaways from the module, aiming to achieve a high learning transfer from the training to their way of working.

ELEMENT 10.1 - TRAINING REVIEW

The instructor shall:

Re-present the overall aims and learning objectives of the module for the participants’ comparison of their learning outcome and the achievement of their previously stated expectations for the module.

The participants shall:

Reflect on their learning outcome and key take-aways from the High Voltage Cable Pulling Module, aiming to achieve a high learning transfer from the module to their way of working by means of e.g.:

a.

group discussions or walk and talk

b.

questions and answers in class, or where suitable

Global Wind Organisation / www.globalwindsafety.org

98 / 114

Made with FlippingBook flipbook maker