AIR CONDITIONING TECHNOLOGY
ELECTRONIC CLIMATE CONTROLLER FOR COOLING CEILINGS, KTRRB SURFACE-MOUNTED INSTALLATION – DESIGN BERLIN 2000 Maßstab 1:1 Blatt A4
ILLUSTRATIONS
KTRRB
KTRRB-052.24x connection in a 2-pipe system
KTRRB
24V~
COM,GND,
H/K
NTC ext.
H/C Last/Load max. 1A
r.H.
ECO
AUS
Blatt A4 Maßstab 1 : 1
10 9 8
7 6 5 4 3 2 1
13 12 11
Elektronik
78,3
25,5
KTRRB-052.24x connection in a 4-pipe system KTRRB-052.24x Anschluss im 4-Rohr-Leitungssystem
Important note: The inflow channels of TPS-1 and TPS-2 are closed at the factory to avoid dirtying during assembly. After assembly, they must be shortened with a knife until they are flush with the wall or ceiling to ensure air circulation. The air ducts should be arranged such that soiling during operation is avoided. It is important that the air surrounding the sensor has the same temperature as the room air to be cooled. If the humidity and temperature of the air to be cooled (ceiling cooling system) is different from that of the air surrounding the sensor, condensation may be detected prematurely or too late. As regards TPS-3, contact with the PCB paths must be avoided to prevent long-term corrosion. Attention in case of sensor extension: laying parallel to conductors carrying a mains voltage can result in faults. The use of shielded conductors reduces sensitivity to electromagnetic fields. Blatt A4 Maßstab 1:1
24V~
COM,GND,
H/K
H
NTC ext.
max. 1A Last/Load
max. 1A Last/Load K
r.H.
ECO
AUS
10 9 8
7
3 2 1 6 5 4
13 12 11
Elektronik
Parallelverdrahtung für Heiz-Kühl-Umschaltung und/oder ECO mehrer Regler (max. 20 Regler)
ECO H C
C ECO H
C ECO H
r.H. max.5
r.H. max.5
r.H. max.5
Parallel wiring for heating / cooling changeover and / or ECO for several controllers (max. 20 controllers)
124
Catalogue 2025
Prices valid from 01.01.2025 – 31.12.2025, prices may be subject to change | V1
Made with FlippingBook Annual report maker