2925U 2940U Universal Rigid Speedtiller Operator Manual

Safety Information

HITCHING / UNHITCHING TO TRACTOR OPERATING INSTRUCTIONS

HITCHING TO TRACTOR 1. Keep well clear when backing up to machine. 2. Shut down tractor. 3. Secure all 3 Point Linkage pins and linch pins in place. 4. Lock up 3 Point Linkage anti sway stabilser system on tractor. 5. Both linkage arms must be set level. 6. Plug in electrical lead to tractor connection (if provided). UNHITCHING 1. Lower implement on to firm, level ground *roller should be lowered until it is in contact with ground. 2. Shut Down Tractor.­ 3. Remove all 3 Point Linkage pins. 4. Unplug electrical lead from tractor connection (if provided).

Figure : 3.18 Danger! CRUSHING HAZARD.

Figure : 3.19 Warning ! CRUSHING OF THE BODY.

ELECTRICAL CONNECTION HOOK UP 1. Ensure tractor and machine electrical con- nections are compatible. 2. Plug lead into tractor terminal. 3. Test lighting prior to road travel. (Power not required for field work.)

3.153.15

2900 Universal Speedtiller

OPERATOR & SAFETY MANUAL

2925U-2940U Op Book.indb 15

9/03/2023 12:45:54 PM

Made with FlippingBook - Online Brochure Maker