2925U 2940U Universal Rigid Speedtiller Operator Manual

AFTER DEL IVERY CHECK L IST

1. Check all pivot pins are fastened and anchor bolts are correctly tensioned. Follow tension specification. See metric & imperial torque tables, pgs 40-41 2. Before mounting wheel to machine, check all hub and rim contact surfaces

are undamaged and free of paint, dirt and grease. 3. Lubricate wheel studs with standard viscosity oil. 4. Tension wheel nuts for torque specifications. Pg 19 5. Check tires are inflated. Pg 19

6. Check discs and disc bolt tension to specified torque 250ft lb / 340nm 7. Ensure all appropriate safety decals are securely attached to machine . Pgs 13-17 8. Check all safety mechanisms are in place and operating correctly 9. Lubricate heavy rear roller bearings. This page 10. Check Instruction manual has been stored with machine.

W A R N I N G

WHEEL BEARINGS • Grease wheel bearings every 20 hours of operation. • Dismantle and repack with grease annually.

LUBRICATION OF PURGABLE HEAVY DUTY REAR ROLLER BEARINGS • Continually rotate roller slowly while greasing. • Grease must purge past seals. • Grease every 8 hours.

31

2925U-2940U UNIVERSAL SPEEDTILLER

OPERATOR & SAFETY MANUAL

Made with FlippingBook - Online Brochure Maker