2925U 2940U Universal Rigid Speedtiller Operator Manual

Maintenance

TORQUE TIGHTENING SEQUENCE. NOTICE: Shown below is the torque tightening sequence. Wheel Nuts must be tightened to firm (but not torqued) initially, and then 4 subsequent passes in the same sequence must be undertaken to torque to specification.

Figure : 5.3 Torque Tightening Sequence.

5.55.5

2900 Universal Speedtiller

OPERATOR & SAFETY MANUAL

2925U-2940U Op Book.indb 5

9/03/2023 12:45:58 PM

Made with FlippingBook - Online Brochure Maker