LYTTON FIRST NATION PROJECT

NEW PROPOSED INTERSECTION

WHAT’S HAPPENING?

Alkali Road will be improved and extended to create a formal intersection and road access off Highway 12.

WHY?

Soil / Gravel Cut

•The Ministry of Transportation and Transit (MOTT) requires these upgrades when connecting to their infrastructure (Highway 12). •The road improvements and proposed intersection will provide connectivity for the subdivision and increase safety for road users.

Soil / Gravel Fill

0

200

400

DETAILS:

Meters

• Alkali Road will be realigned, and a new access will be constructed off of Highway 12.

0

100

200

• The existing Alkali Road access will be retained for 1502 Alkali Road.

Meters

0

50

100

Meters

•Proper turn lanes and merge lanes will be added to the road infrastructure.

• The roads will be paved and painted to direct traffic safely.

0 5

1:500

25m

OVERALL

NUUAUTIN IR 2B SUBDIVISION AND STEIN WATER SYSTEM IMPROVEMENT PROJECTS WWW.APLINMARTIN.COM/LFNSUBDIVISION WWW.APLINMARTIN.COM/LFNWATERSYSTEM

Made with FlippingBook - Online magazine maker