2995P2 2912P2 Operator Safety Manual

PERFORMING MAINTENANCE

DAILY MAINTENANCE CHECK FOR OPTIMUM PERFORMANCE

Disc bolts - Check first 10hrs of operation

BEFORE STARTING WORK:

1. Check all pivot pins are fastened and anchor bolts are correctly tensioned. Follow tension specification on Pg 20 before mounting wheel to machine, check all hub and rim contact surfaces are undamaged and free of paint, dirt and grease. 2. Lubricate wheel studs with standard viscosity oil. 3. Tension wheel nuts for torque specifications. Pg 20 4. For field operation: Re-tension after first, fifth, then every fifty hours of operation. 5. For road travel re-tension first 3 miles (5kms), 10 miles (15kms), and thereafter at 25 miles (40kms) intervals. 6. Check tyres are inflated according to pressure stated on tyre. 7. Check discs and disc bolt tension to specified torque 250ft/lb / 340Nm. 8. Check for damaged, worn and fatigued parts. Have machine repaired if necessary. 9. Ensure all appropriate safety decals are securely attached to machine. Pgs 13-17 10. Check hydraulic system is fully primed. Pg 22 11. Check all safety mechanisms are in place and operating correctly. 12. Lubricate rear roller bearings. Pg 37 13. Instruction manual has been read, understood and stored with machine.

Figure 45

Always reset adjustments after changing disc blades.

Figure 46

Disc arm locating bolts - Check first 10hrs of operation

35

2995P2 & 2912P2

OPERATOR & SAFETY MANUAL

Made with FlippingBook - Online Brochure Maker