2995P2 2912P2 Operator Safety Manual

AFTER DEL IVERY CHECK L IST

1. Check all pivot pins are fastened and anchor bolts are correctly tensioned. Follow tension specification. Pg 20 2. Before mounting wheel to machine, check all hub and rim contact surfaces

are undamaged and free of paint, dirt and grease. 3. Lubricate wheel studs with standard viscosity oil. 4. Tension wheel nuts for torque specifications. Pg 20 5. Check tyres are inflated. Pg 20

6. Check discs and disc bolt tension to specified torque 250ft lb / 340Nm 7. Ensure all appropriate safety decals are securely attached to machine . Pgs 13-17 8. Check hydraulic system is fully primed. Pg 22 9. Check all safety mechanisms are in place and operating correctly 10. Lubricate heavy rear roller bearings. This page 11. Instruction manual has been stored with machine.

W A R N I N G

WHEEL BEARINGS

• Grease wheel bearings every 20 hours of operation. • Dismantle and repack with grease annually.

LUBRICATION OF PURGABLE HEAVY DUTY REAR ROLLER BEARINGS • Continually rotate roller slowly while greasing. • Grease must purge past seals. • Grease every 8 hours.

Adjusting screw

WHEEL HYDRAULIC CYLINDER HEIGHT ADJUSTMENT

• Lower machine to ground level until hydraulic cylinders are free of pressure. • Loosen locking screws. See figure 4 7 • Move ram end pin. • Rotate ram end to desired setting. • Secure ram end pin and re-tension locking screws.

Locking screw

Figure 47

37

2995P2 & 2912P2

OPERATOR & SAFETY MANUAL

Made with FlippingBook - Online Brochure Maker