Part 3 — Site Plan Review
City of Andover Unified Development Manual

Case No. SP-______-______
Applicant ______________________________________________
Provided Yes No N/A
Site Plan Review Checklist — APPLICATION REQUIREMENTS FOR LIGHTING (3.3.6) A. Comprehensive Site Plan — elements to include in addition to those listed in 3.3.3-C 1. Proposed ingress and egress for the site a. Include on-site parking areas, parking spaces, and adjacent driveways 2. Building Data a. Location and size of all existing buildings to remain on the site b. Location and size of all proposed buildings c. Location of all buildings along the street frontage within 150 feet of the site's boundaries d. Approximate height of each building 3. Show all existing lighting standards to remain and proposed lighting standards on the site a. Routing of electrical supply to lighting standards B. Lighting Intensity — map of isofootcandles at ground surface of project site 1. Note the project site's minimum light intensity, maximum light intensity, and average light intensity 2. Calculations showing the ratio of average to minimum lighting levels, over the entire project site 3. Calculations showing the ratio of maximum to minimum lighting levels, over the entire project site C. Lighting Standard Detail 1. Scaled drawing of proposed lighting standards, with all size specifications,
including mounting height of each luminaire 2. Information on type and lumens of bulbs 3. Materials and colors of base, pole, arm, and luminaire 4. Ground or wall anchorage details

Foster Design Associates LLC
Main TOC
Site Plan Review TOC
page  of  42 50
Made with FlippingBook - professional solution for displaying marketing and sales documents online