Part 2 — Unified Development Ordinance Zoning Regulations
City of Andover Unified Development Manual

G. Application Requirements. 1. Pre-application Conference. A pre-application conference between the Applicant and designated City staff is required before filing an application for modification or replacement of an existing wireless facility, or construction of a new wireless facility. a. The pre-application conference may be waived by the Zoning Administrator. b. The purpose of the pre-application conference is to ensure the Applicant understands all requirements, to address issues that will expedite the review and approval process, and to establish a tentative timeline. c. The pre-application conference does not toll applicable shot-clocks under federal or state law. 2. Application Contents. Unless waived by the Zoning Administrator, the Applicant must include the following information in an application for a zoning permit for a wireless facility in Andover. a. Site plan. b. Landscape plan that demonstrates effective screening as required by Andover's Site Plan Review section 3.4.11 Screening for Equipment and Structures, with all materials and plant sizes specified. c. Elevation drawings of the proposed wireless facility. Show all towers, base stations, antennas, transmission equipment, accessory equipment, cabinets, fencing, screening, landscaping, lighting, and other improvements related to the facility, including information on specific colors and materials. d. Lighting plan , showing that the proposed wireless facility complies with Federal Aviation Administration regulations.
e. Digital before and after photo simulations of the site, demonstrating the visual impact of the proposed wireless facility on the surrounding environment. (1) The Zoning Administrator may require photo simulations from any specific vantage point. f. Notices. A statement from the Applicant affirming that required notices were sent in a timely manner. (1) Include a list of the addresses to which notices were sent. (2) Include copies of certified mail return receipts . g. Leased Property. If any part of the wireless facility site is leased, the Applicant must provide a signed copy of the lease, and a signed statement from the property owner indicating the property owner's approval for the proposed wireless facility. (1) The documentation must contain a provision stating that, if the lessee abandons the facilities or terminates the lease and fails to remove the wireless facility, the property owner will be responsible for removing the wireless facility. h. Engineer's Report. A report from a licensed engineer registered in Kansas which: (1) Describes the wireless facility's height and design, including a cross section and elevation. (2) Describes the wireless facility's structural capacity, and its ability to safely accommodate antennas and other equipment. (3) Includes the engineer's seal and license number. i. An application for Zoning Administrator approval of antenna placement on roofs, walls, and existing wireless infrastructure must include a final site and building plan.
Main TOC Zoning TOC Provisions for Specific Uses

Article 4 — page  of  22 26
Foster Design Associates LLC
Made with FlippingBook - professional solution for displaying marketing and sales documents online