K-Line Ag © ___________________________________________________________________
First Start-up
Comments
Pg
Before starting
Set machine on level surface
Ensure both Tractor 3 Point Linkage arms are correctly adjusted for level working. Adjust roller 1” or 25mm above surface. Preliminarily adjust tilt approximately ¾” or 20mm higher at front.
15
15/16
Run at operating speed & check adjustments in this order. Tracking in line . Lateral front disc adjustment
15/16 17 15 18
Depth (adjust deeper gradually).
Side coulter setting
What do you need your Speedtiller ® to do?
Comments
Pg
Mulch in trash for humus building
Shallower and faster better for mulching. Shallower gives more trash flow. May have to go slower if trash content is heavy. Adjust side coulter if necessary
15
18
Full ground disturbance for better weed control, trash flow & seed bed preparation.
Pay Specific attention to settings & operating conditions Full ground disturbance starts at 2 ½” 60mm Cross working 15° off line is best to level soil and give better trash flow. Soil moisture & conditions.
Page | 19
Made with FlippingBook - Online Brochure Maker