Universal Speedtiller Operator Safety Manual

K-Line Ag © ___________________________________________________________________

First Start-up

Comments

Pg

Before starting

Set machine on level surface 

Ensure both Tractor 3 Point Linkage arms are correctly adjusted for level working. Adjust roller 1” or 25mm above surface. Preliminarily adjust tilt approximately ¾” or 20mm higher at front.

15

15/16

Run at operating speed & check adjustments in this order.  Tracking in line .  Lateral front disc adjustment 

15/16 17 15 18

Depth (adjust deeper gradually).

Side coulter setting

What do you need your Speedtiller ® to do?

Comments

Pg

Mulch in trash for humus building

Shallower and faster better for mulching. Shallower gives more trash flow. May have to go slower if trash content is heavy. Adjust side coulter if necessary

 

15

18

Full ground disturbance for better weed control, trash flow & seed bed preparation.

Pay Specific attention to settings & operating conditions  Full ground disturbance starts at 2 ½” 60mm  Cross working 15° off line is best to level soil and give better trash flow.  Soil moisture & conditions.

Page | 19

Made with FlippingBook - Online Brochure Maker