K-Line Ag © ___________________________________________________________________
Daily maintenance check for optimum performance
Before Starting Work: 1. Check all pivot pins are fastened and anchor bolts are correctly tensioned. Follow tension specification on Pages 35-36 2. Before mounting wheel to machine, check all hub and rim contact surfaces are undamaged and free of paint, dirt and grease. 3. Lubricate wheel studs with standard viscosity oil. 4. Tension wheel nuts to see page 26 for torque specifications. 5. For field operation: Re-tension after first, fifth, then every fifty hours of operation. 6. For road travel re-tension first 3miles (5kms), 10miles (15kms), and thereafter at 25miles (40kms) intervals 7. Check tires are inflated see page 26. 8. Check discs and disc bolt tension to specified torque 250ft lb / 340nm 9. Check for damaged, worn and fatigued parts. Have machine repaired if necessary. 10. Ensure all appropriate safety decals are securely attached to machine – Refer to Pages 5-7 11. Check hydraulic system is fully primed – see Page 25 12. Check all safety mechanisms are in place and operating correctly 13. Lubricate rear roller bearings – Refer to Page 25 14. Instruction manual has been read, understood and stored with machine.
Figure 32
Disc bolts – check first 10 hours
Figure 33
Figure 31
Always reset adjustments after changing disc blades
Disc Arm Locating Bolts – check first 10hrs of operation
Figure 34
Page | 22
Made with FlippingBook - Online Brochure Maker