2830 2840TAT TrackAttack 3-4M Operator Safety Manual

Maintenance

DAILY MAINTENANCE CHECK FOR OPTIMUM PERFORMANCE

BEFORE STARTING WORK:

Disc bolts - Check first 10hrs of operation

• Follow tension specifications. • Check all pivot pins are fastened and anchor bolts are correctly tensioned. • For field operation: re-tension after 1st, 5th, then every 50 hours of operation. • For road travel re-tension first 3 miles (5kms), 10 miles (15kms), and thereafter at 25 miles (40kms) intervals. • Check discs and disc bolt tension to specified torque 250ft/lb / 340nm. • Check for damaged, worn and fatigued parts. Have machine repaired if necessary. • Ensure all appropriate safety decals are securely attached to machine. • Check hydraulic system is fully primed 3. HYDRAULIC OPERATION & SAFETY - Prim- ing Hydraulic System. • Check all safety mechanisms are in place and operating correctly. . • Ensure Instruction manual has been read, understood and stored with machine. NOTE: Always reset adjustments for front disc gang lateral positioning according to instruc- tions 4. FIELD OPERATION - Lateral Front Disc Gang Positioning.

Figure : 5.1 Disc Bolts.

Disc arm locating bolts - Check first 10hrs of operation

Figure : 5.2 Disc Arm Bolts Location.

5.35.3

2800TAT SERIES TRACK ATTACK

OPERATOR & SAFETY MANUAL

Made with FlippingBook - Online Brochure Maker