2740T Trashcutter 4ft Operator Safety Manual

A F T E R D E L I V E R Y C H E C K L I S T

1. Check all pivot pins are fastened and anchor bolts are correctly 2. tensioned. Follow tension specification. pg 17 3. Before mounting wheel to machine, check all hub and rim contact surfaces are undamaged and free of paint, dirt and grease. Pg 17 4. Lubricate wheel studs with standard viscosity oil. Pg 17 5. Tension wheel nuts for torque specifications. Pg 17 6. Check tires are inflated. Pg 17 7. Ensure all appropriate safety decals are securely attached to machine. Pgs 12-15 8. Check hydraulic system is fully primed. pg 19 9. Check all safety mechanisms are in place and operating correctly. 10. Lubricate heavy rear roller bearings. this page 11. Instruction manual has been stored with machine. TYRE SAFETY & PRESSURES • Always cage tyres before seating beads. • Never exceed a stated pressure when seating beads. • Do not attempt to mount a tyre unless you have the suitable equipment & experienced personnel. • Inflating tyres can be dangerous. Always stand to the side when inflating. • Load ratings of replacement tires should meet or exceed weight requirements. • Correct tire pressure is 90PSI/ 620KPA • Before mounting wheel to machine, check all hub & rim contact surfaces are undamaged & free of paint, dirt & grease. • Lubricate wheel stubs with standard viscosity oil. • Tension wheel nuts to 320ft Ilbs / 433nm. • For field operation: Re-tension afterst, 5th, then • every 50 hours of operation. • For road travel re-tension first 3miles (5kms), 10miles (15kms), and thereafter at 25miles (40km) intervals . COULTER GANG ASSEMBLY INSTRUCTIONS • Follow exploded view for assembly • NB when re-tensioning spindle nuts always loosen U-bolts on one bearing arm to allow for side movement & re-tighten.

Figure 33

Figure 34

TYRE PRESSURE Centre: 90PSI / 620KPA Wing Wheels (both) 75PSI / 517KPA Wheel Nut Tension: 320ft lbs / 433nm

Figure 35

COULTER GANG SERVICE SCHEDULE

Torque Table 1st Assembly 5hrs Operation 10hrs Operation

Spindle Nuts

Coulter Bolts

1100ft/Ibs 1100ft/Ibs 1100ft/Ibs 1100ft/Ibs

50ft/Ibs 50ft/Ibs 50ft/Ibs 50ft/Ibs

Every 50 hrs

Figure 37

Figure 36

WARNING Wheel bearings: • Grease wheel bearings every 20 hours of operation. • Dimantle and repack with grease annually.

Coulter bolt Spindle nut

Bearing Arm

29

2740T TRASHCUTTER

OPERATOR & SAFETY MANUAL