PC Contracting Risk Assessment
Risk Assessment Matrix
Date
30.04.25
5
4
3
2
1
X
Assessor
Nicholas Procter – CMIOSH
5
25
20
15
10
5
Project Address
Mulgrave Theatre, Hurlingham Club
4
20
16
12
8
4
Description of Task Being Undertaken
Painting & Decorations Final Coat/ Finishings
3
15
12
9
6
3
2
10
8
6
4
2
Likelihood: 5= Certain, 4=Probable, 3= Likely to Occur, 2= May Occur, 1= Unlikely
1
5
4
3
2
1
Severity: 5= Multi Fatality; 4= Fatality; 3= Major injury; 2= 3 Day Injury; 1= Non-Reportable Accident
Low 1-6 Medium 8-12 High 15-25
Activity
Who might be harmed?
Risk
Control Measures
Working at height
Falls from height
4 4 16
PCC will always endeavour to eliminate work at height when reasonably practicable.
2
4
8
Operatives Contractors
• • •
Members of the public
All working at height will be undertaken for short durations of time, and there will be no lone working. All works to be supervised by a competent supervisor at all times. Suitable access equipment will be provided for works at height, including hops ups, step ladders and swing gated podium and mobile towers. All the aforementioned access equipment will be check/ inspected before use for any obvious defects.
PC Contracting – Mulgrave Theatre _Painting & Decorating Final Coatings