Access and egress routes to be kept clear at all times. All debris will be cleared as soon as reasonably practicable as works proceed. During our installation activities appropriate signage displayed. Physical barriers to be erected to prevent access. 5 tread step ladders agreed for max 15 minutes twice daily. Full permit and risk assessment to be completed before each use.
Hard hat, safety boots, high visibility vests and suitable gloves to be worn at all times
Manual Handling
3 3 9
PCC will avoid/ eliminate the need to manual handle where possible.
1
3
3
Operatives
Musculoskeletal injuries. Falling/tripping
•
Mechanical equipment to be used where possible to eliminate manual handling.
Hiab’s / mechanical aids to be used for unloading and loading materials from the delivery trucks where possible.
Where mechanical equipment is not loads will be divided and reduced. The loads will be split into smaller, more manageable sizes for transportation.
All operatives to be trained in the correct techniques of manual handling.
Access and egress routes to be kept clear of obstructions at all times.
Hard hat, safety boots, high visibility vests and sufficient gloves to be worn at all times.
PC Contracting – Mulgrave Theatre _Painting & Decorating Final Coatings