Electricals / power tools
PCC will obtain evidence of isolation certificates before entering ceiling voids or electricals risers to undertake installations works.
3
4
12
1
4
4
Operatives
Electrocution burns/ fatality/ Hand arm vibration.
•
PCC will use only 110v power tools. Battery power tools will be soured when practicable.
All tools will be PA tested, and records kept within the PCC safety folder and head office for auditing purposes.
Vibration assessments to be developed and operators to be briefed on maximum periods of time for using vibrating tools and HAVS. Supervisor to periodically monitor employees if they have any symptoms of HAVS or uncomfortable strains on hands and arms.
Daily trigger time logs to be recorded by operatives.
Trailing cables to be as short in length as practicable and hung overhead or otherwise kept out of walkways and traffic routes and made safe.
Cables to be checked daily for damage.
PC Contracting – Mulgrave Theatre _Painting & Decorating Final Coatings
Made with FlippingBook Digital Publishing Software