MRMTC Tabletop Workshop Reference Documents

Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002

FIGURE 5-2: EXAMPLE OF A PORTION OF A PAIRWISE COMPARISON FOR METRICS ASSESSMENT

Column A  Strongly  Favorable 

Column A  More  Favorable 

Column A  Mildly  Favorable 

Neither  Favorable  (neutral) 

Column B  Mildly  Favorable 

Column B  More  Favorable 

Column B  Strongly  Favorable 

Column A Metrics 

Column B Metrics 

Infrastructure  Improvement Costs  Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs   Infrastructure  Improvement Costs 

X

Labor and Permitting Costs 

X

Transport to Rail Costs  

X

Route Environment Characteristics  

X

Impact of Weather/Tides to Route  

X

Number of Water Areas Nearby Route 

Number of Sensitive Environmental Areas  Nearby Route  

X

X

Public Acceptability of Route 

X

Number of Permits 

X

Cumulative Worker Exposure 

X

Cumulative Population Dose along Route  

X

Average Accident Frequency on Route 

X

Transit Duration per Conveyance and Consist 

X

Immediacy of Ability to Perform Transfer  

X

Security Vulnerability of Route

Page 5-12

Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017

Made with FlippingBook - Online Brochure Maker