Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002
FIGURE 5-6: ELEVATION PROFILE FOR HHT ROUTE FROM BRP ISFSI TO TRANSLOAD SITE IN GAYLORD, MI [1]
FIGURE 5-7: ELEVATION PROFILE FOR RAIL FROM PETOSKEY, MI TRANSLOAD SITES TO GCUS VIA DURAND, MI (OPTION 1) [1]
FIGURE 5-8: ELEVATION PROFILE FOR RAIL FROM PETOSKEY, MI TRANSLOAD SITES TO GCUS VIA ANNPERE, MI (OPTION 2) [1]
FIGURE 5-9: ELEVATION PROFILE FOR RAIL FROM GAYLORD, MI TRANSLOAD SITES TO GCUS VIA FLINT, MI (OPTION 1) [1]
Page 5-19
Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017
Made with FlippingBook - Online Brochure Maker