MRMTC Tabletop Workshop Reference Documents

Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002

TABLE 5-10: WEIGHTING OF ROUTES AT MINIMUM METRIC VALUE (PART 1 OF 3)

Infrastructure Improvement Costs

Labor and Permitting Costs

Route Environment Characteristics

Impact of Weather/Tides to Route

Transport to Rail Costs

Metric Minimized:

Route

Rank

Result

Rank

Result

Rank

Result

Rank

Result

Rank

Result

1. HHT to Petoskey, MI – Clarion Ave Option 1 2. HHT to Petoskey, MI – Washington St Option 1 3. HHT to Petoskey, MI – Clarion Ave Option 2 4. HHT to Petoskey, MI – Washington St Option 2 5. HHT to Gaylord, MI – Option 1 6. HHT to Gaylord, MI – Option 2 7. Barge Route to Milwaukee, WI

1

15.25%

1

15.26%

1

15.23%

1

15.25%

1

15.25%

2

15.12%

2

15.13%

2

15.10%

2

15.18%

2

15.12%

3

14.68%

3

14.68%

3

14.66%

3

14.67%

3

14.68%

4

14.52%

4

14.52%

4

14.49%

4

14.53%

4

14.51%

6

13.47%

6

13.49%

6

13.47%

6

13.49%

6

13.45%

5

14.36%

5

14.39%

5

14.40%

5

14.39%

5

14.35%

7

12.60%

7

12.54%

7

12.66%

7

12.48%

7

12.64%

Page 5-34

Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017

Made with FlippingBook - Online Brochure Maker