MRMTC Tabletop Workshop Reference Documents

Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002

TABLE 5-13: WEIGHTING OF ROUTES AT MAXIMIZED METRIC VALUE (PART 1 OF 3)

Infrastructure Improvement Costs

Labor and Permitting Costs

Route Environment Characteristics

Impact of Weather/Tides to Route

Transport to Rail Costs

Metric Maximized:

Route

Rank

Result

Rank

Result

Rank

Result

Rank

Result

Rank

Result

1. HHT to Petoskey, MI – Clarion Ave Option 1 2. HHT to Petoskey, MI – Washington St Option 1 3. HHT to Petoskey, MI – Clarion Ave Option 2 4. HHT to Petoskey, MI – Washington St Option 2 5. HHT to Gaylord, MI – Option 1 6. HHT to Gaylord, MI – Option 2 7. Barge Route to Milwaukee, WI

1

15.26%

1

15.25%

1

15.28%

1

15.26%

1

15.25%

2

15.13%

2

15.13%

2

15.15%

2

15.05%

2

15.13%

3

14.69%

3

14.69%

3

14.72%

3

14.71%

3

14.69%

4

14.53%

4

14.53%

4

14.55%

4

14.51%

4

14.53%

6

13.50%

6

13.47%

6

13.50%

6

13.47%

6

13.49%

5

14.38%

5

14.35%

5

14.34%

5

14.34%

5

14.37%

7

12.52%

7

12.58%

7

12.46%

7

12.67%

7

12.54%

Page 5-37

Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017

Made with FlippingBook - Online Brochure Maker