Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002
FIGURE 6-1: FUELSOLUTIONS W150 STORAGE CASK HORIZONTAL LOADING [11]
Note: The transfer trailer and transfer cask depicted in this figure will not be used. 6.1.1 Pre-Mobilization/Mobilization Points of Contact at Site This section provides the point of contact for the BRP site [36, 37] as listed below and in Figure 6- 2. Big Rock Point Project Manager (U.S. NRC):
Jim Shepherd 301-415-6712 james.shepherd@nrc.gov
Page 6-3
Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017