Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002
FIGURE 6-2: BIG ROCK POINT - POINT OF CONTACT AT SITE [36]
Facility Interface Data Sheet Big Rock Point General Information
Docket Numbers: Permanent
Site:
Big Rock Point
Unit: 1
50-155, 72-043
Site Status:
Shutdown
Operating
Decommissioned
Address:
Contact Name: Tim Horan
10260 US Route 31, North Charlevoix, MI 49720
Organization/Position: ISFSI Manager
Site Operator:
Entergy
Nuclear
Operations
Phone Number: 213-237-2392
NSSS Vendor:
General Electric
Fax Number: Cell 419-205-0163
Unit Type:
PWR
BWR
Other
Special Permit Requirements The following permits for transporting the loaded TS125 from the BRP ISFSI site would have to be obtained by the shipper: A formal clearance submission would be made to the originating Class I rail carrier. For the purposes of this project, the goal is to deliver the overpacks from the BRP site to the Class I railroad, which would clear the entire route with all participating railroads. DOE Manual 460.2-1A states "For shipments not subject to an NRC license, DOE will be responsible for stakeholder interactions, final route approval, and other applicable safeguards and security requirements. DOE will meet or exceed the requirements prescribed by DOT and NRC for comparable commercial transportation." For the purposes of this report, the licensee and shipper is the DOE and it is being treated like any other commercial shipper in these reports. Therefore, it would be required to file an application with the NRC (if deemed subject to it) for an approved rail route from the BRP site to the identified destination. Note: a formal clearance submission is required for all dimensional 3 shipments on all railroads, regardless of the carriers in the route. So, if the shipment originates on a short line, the clearance may be submitted to the short line if it has the capabilities to clear its own shipments. The
3 The railroad industry definition of dimensional is any oversized cargo with respect to length, height, or weight of a non-standard shipment.
Page 6-4
Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017