Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002
Since the site is water-served with a potential barge landing, inform the USCG that HHT operations will commence, so it will be aware of the activity on the site and possibly evoke a Marine Safety Zone during active operations. Transportation Personnel Readiness: Identify key personnel and their qualifications. Ensure required background checks are current and requirements of coverage of drug and alcohol programs are met. Provide copies of the training materials and ensure required trainings are current for all employees involved. Provide copies and ensure that all personnel are in possession of and working from the correct procedures and Radiation Work Permit (RWP). Ensure all private security personnel have required weapons certifications to cover the transportation cycle. Ensure the transportation personnel would be monitored for radiological exposure, if required. Ensure proper equipment and personnel are available to monitor workers for contamination, if required. Transportation Readiness Notifications: Provide copies and ensure proper notifications have been made to the Tribes, NRC, State and local governments, DOT, USCG, and DOE as applicable. The USCG would need to be notified and should be aware of the transportation activities taking place on site. Any water served or adjacent facility is required to have an active and updated safety and security plan, which must be reviewed and approved by the USCG. o If a plan exists, it should be confirmed by the shipper and updated as to the actual operations designed to take place on the site during the campaign Provide copies of and ensure all required permits to transport SNF are prepared and/or in place. Ensure proper notification requirements are being met for the disposal/storage facility. Identify scheduled meetings and briefings that would be conducted for all phases of the shipments. 6.1.3 Site Operations Prior to each transportation cask loading operation, equipment associated with the canister transfer will need to be staged, inspected, and prepared for the transfer operation. Based on review of the ISFSI at BRP, additional room will be required to stage the equipment for the transfer operation (crane and heavy haul transport trailer). Site modifications would include
Page 6-13
Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017
Made with FlippingBook - Online Brochure Maker