Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002
FIGURE 6-6: TRANSPORTATION CASK PLACEMENT ONTO AND REMOVAL FROM THE RAIL CAR [11]
Note: Steps 4 and 5 are not utilized in this figure (system will only be handled horizontally).
Page 6-22
Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017
Made with FlippingBook - Online Brochure Maker