MRMTC Tabletop Workshop Reference Documents

Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002

FIGURE 6-6: TRANSPORTATION CASK PLACEMENT ONTO AND REMOVAL FROM THE RAIL CAR [11]

Note: Steps 4 and 5 are not utilized in this figure (system will only be handled horizontally).

Page 6-22

Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017

Made with FlippingBook - Online Brochure Maker