6.3 List of Equipment Table 6-2 provides the equipment required for this work and Table 6-3 provides additional equipment to that listed in Section 2.3 for performing the BRP site transfer. TABLE 6-2: LIST OF EQUIPMENT Canister TS125 Impact Limiters Annulus Seal TS125 Cask Cavity Spacer Shield Plug Retainers Standard Lifting Slings TS125 Transportation Cask Personnel Barrier Closure Lid Lifting Fixture Trunnion Installation and Removal Tool Helium Leak Detector Miscellaneous Hoses and Fittings Skid Positioning System Railcar TS125/W100 Docking Collar Intermodal Skid Intermodal Skid Horizontal Lift Fixture
Page 6-29
Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017